Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
TIANHE non-rotating stabilizer (rubber sleeve stabilizer) is able to avoid blade wear and wall damage during drilling. The non-rotating stabilizer consists of mandrel, copper washer, rubber sleeve, spacer sleeve and self-locking lower sub.
Sleeve | Mandrel | Overall Length(mm) |
Product Code |
||||
Length(mm) | O.D.(mm) | Blade Qty | I.D.(mm) | Fishing O.D.(mm) | Connection | ||
380 | Φ155 | 4 | Φ44 | Φ121 | NC38 | 1638 | W0900301 |
380 | Φ157 | 4 | Φ44 | Φ127 | NC38 | 1638 | W0900401 |
500 | Φ214 | 4 | Φ71 | Φ165 | NC50 | 2013 | W0901001 |
500 | Φ220 | 4 | Φ71 | Φ165 | NC50 | 2013 | W0901201 |
500 | Φ255 | 4 | Φ71 | Φ165 | NC50 | 2013 | W0901601 |
500 | Φ304 | 4 | Φ76 | Φ203 | 6 5/8 REG | 2000 | W0902001 |
500 | Φ310 | 4 | Φ76 | Φ203 | 6 5/8 REG | 2000 | W0902101 |
500 | Φ313 | 4 | Φ71 | Φ165 | NC50 | 2013 | W0902103 |
500 | Φ371 | 4 | Φ71 | Φ197 | 6 5/8 REG | 2013 | W0902201 |
500 | Φ374 | 4 | Φ71 | Φ203 | 6 5/8 REG | 2013 | W0902203 |
520 | Φ405 | 4 | Φ76 | Φ241 | 7 5/8 REG | 2045 | W0902301 |
520 | Φ430 | 4 | Φ76 | Φ241 | 7 5/8 REG | 2045 | W0902401 |
520 | Φ444 | 4 | Φ76 | Φ241 | 7 5/8 REG | 2045 | W0902501 |
600 | Φ558 | 4 | Φ76 | Φ241 | 7 5/8 REG | 2130 | W0902701 |
690 | Φ711 | 5 | Φ76 | Φ241 | 7 5/8 REG | 2210 | W0903401 |
Tianhe Oil Group Huifeng Petroleum Equipment Co., Ltd is a modernized medium-scale enterprise specialized in production of oil and gas tools.
All the packing will be suitable for export packing. All precautions will be taken to protect the cases from damage during overseas transportation,so as to receive them under proper conditions at the final destination.
1)China Manufacturer
2)50years of the production experience
3)High Qualtiy contol procedure
4)API Certified
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T or L/C detc payment terms are acceptable.
3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid payment or deposit before we go into production. After we get the deposit, we start to process the order. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.